completed projects
-
- Project for the delivery of cargoes of various categories to the ALV Northern Sea Route from Petrolesport to Petropavlovsk-Kamchatsky: Motozavoznya, Schooner Lena, KAZ truck, 2 semi-trailers… Read more -
- Project for the delivery of a batch of equipment manufactured by Caterpillar (60 places, 475 tons) from the port of Petrolesport / port of Bronka St. Petersburg, Russia to Antwerp, Belgium… Read more -
- Project for the delivery of a batch of equipment (Drilling rigs Liebherr and Abi + loader and related materials) from the port of Seroglazka in Petropavlovsk-Kamchatsky… Read more -
- Organization and handling of freight forwarding services at the terminal of JSC `Petrolesport '. Two boats of ST23WIM-H project, RK "Anatoly Klimov" and "Victor Vorotylo". ... Read more -
- Organization of handling tug "Antey" on the terminal of JSC "PETROLESPORT". Unit weight - 690 tons. Overall dimensions: 30.46x11.6x5.36 m. Transshipment is made according to the option ... Read more -
- A project for the delivery of a batch of equipment (107 seats, 516 mb) from the port of Marina di Carrara, Italy to the port of St. Petersburg, Russia. During implementation ... Read more -
- Project for the delivery of a batch of equipment (38 seats, 725 tons) from the raid of the port of New Amsterdam, Guyana to the destination station Kiya-Shaltyr, Russia ... Read more -
- The size of the cargo unit is 42 meters, the weight is 286 tons. Report on the work done: - Trans-shipment from sea to river was organized ... Read more -
- Unit weight - 27 tons. Progress report: Organization of PRR, cargo securing work at 40’FR with further shipment to ... Read more -
- Progress report: Organization of PRR at the terminal of Petrolesport... Read more -
- Progress Report: Organization of the RRP works, fastening and forwarding at the terminal of Petrolesport Read more -
- Transportation Report: The US Houseboat was unloaded from a liner to one of the berths of... Read more -
- Transportation report: Autoclaves were unloaded from the side of the sea vessel to the warehouse, a river deck fastening scheme was developed on the river vessel ... Read more -
- Shipping Report: Read more -
- Transportation report: Houseboat "THOROUGHBRED" unloaded from the board of mv SINGELGRACHT, customs cleared, reloaded onto water, registered arrival / departure ... Read more -
- Transportation report: Formation of an accelerated container train on the tracks of PetroLesPort OJSC, delivery to the Kondopoga OJSC plant for paper filling, return ... Read more -
- Transportation report: Steel arrived at the port from Japan on a roll trailer, reloading on special platforms Read more -
- Transportation report: Overload from a roll trailer to motor vehicles Ring width 6.5 m, special permission for travel received Read more -
- Shipping Report: Read more -
- Transportation report: The first project of 2013 - transshipment of equipment for the construction of the Moscow metro. During transshipment, for ease of transportation, ... Read more -
- Loading of a cargo place, weighing 100 tons, with one crane Read more -
- Transshipment according to a / t scheme - roll trailer of 90 t cargo unit Read more -
- The loading of fire engines on the tramp vehicle was carried out using a special construction. Read more -
- During the navigation period, river transport is the best option for sending imported cargo over long distances. Consignment ... Read more -
- The project of reloading steel strips was implemented according to the ship-warehouse-railway scheme. Read more -
- In 2014, 5 shiploads of equipment were successfully shipped to the port of Sabetta. 3 ship lots ... Read more -
- Shipping Report: Read more -
- Shipping Report: Read more -
- Transportation report: Autoclaves were unloaded from the side of the sea vessel to the warehouse, a river deck fastening scheme was developed on the river vessel ... Read more -
- The gantry crane was disassembled, loaded and fixed on a linear service of the company Maersk with placement on 12 flat racks ... Read more